Ring Lock Scaffolding System for Residential Construction

Sidewalk Protection Scaffolding, Sidewalk Bridge Shed Scaffolding

Sidewalk Shed is a structure constructed to protect pedestrians from objects falling from a building or construction site.

Sidewalk Bridge is required when construction work is over 40 feet high or 25 feet high for demolition work and whenever there is a dangerous condition irrespective of the height.

A sidewalk shed must be erected whenever materials will be hoisted over the sidewalk, regardless of building height or horizontal distance between building and sidewalk.



  • Item NO.:

    SBP
  • Lead Time:

    30days
  • Product Origin:

    Guangzhou, China
  • Shipping Port:

    Guangzhou, China
  • Payment:

    T/T, L/C at sight
  • Min order:

    500PCS
  • Color:

    Powder Coated / PAinted Blue, Red, Orange, Yellow
  • Material:

    Steel
  • Product Detail

Sidewalk Bridge Shed Scaffolding

Code Description Material Weight(kg) Weight(lbs)
SBP.8 Sidewalk Bridge Post 8' Ø89x5.0mm (3.5"ODx0.196"t) 29.61  65.29 
SBP.10 Sidewalk Bridge Post 10' 35.93  79.23 
SBP.12 Sidewalk Bridge Post 12' 42.33  93.34 
SBP.14 Sidewalk Bridge Post 14' 48.71  107.41 
SBP.16 Sidewalk Bridge Post 16' 55.03  121.34 
SBP.DB.124 Bridge Brace 124" Ø32x2.0mm (1.25"ODx0.078"t) 4.77  10.52 
SBP.GIRT.96 Bridge Girth 96" Ø38x2.0mm (1.5"ODx0.078"t) 4.47  9.86 
SBP.HC Head Clip 1.40  3.09 
* Surface Treatment: Powder Coated, Painted


Bridge Post


Bride Girth and Brace


Head Clip


Junior Beam


Sidewalk Bridge Post Appication

Leave Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we

how can we help you
You can contact us any way that is convenient for you. We are available 24/7 via email or telephone.
Contact Us
Related products
Cross Lock Scaffolding Ledger
Cross Lock Scaffolding Ledger / Horizontal
Cross Lock Scaffolding is a kind of new modular scaffolding system which in simple structure and fabricated with few accessories, it can provide easy erection and dismantling, and speeded and high efficiency performance, and it is use for residential, commercial construction. Scaffolding Components: Standard, Ledger.
View More
Kwikstage Step Down Bracket
Kwikstage Scaffolding Hop Down Bracket, Step Down Bracket
Kwikstage Scaffolding Hop Down Bracket / Step Down Bracket gives balance and stability to the bottom step when getting on or off stair access at ground level. The first step onto stair access can be difficult due to site constraints, ground levels and base outs. The use of the step down bracket gives the comfort of adjustment to balance the variabl1
View More
Tubular Side Bracket
Powder Coated Tubular Side Bracket with Saddle Hanger
Side brackets allow for the extension of the scaffold platform beyond the legs, usually by a multiple of plank widths. When used with frame scaffolds, the side bracket is placed at the leg and is parallel to the frame or bearer. Tubular Side Bracket is the kind of bracket that made by dia.1.65"x0.09"t (O.D 42x2.3mm) steel tube and with saddle hange1
View More
Steel Access Ladder
Powder Coated Steel Access Ladder for Frame Scaffolding
Access Ladder is the light vertical access device for frame scaffolding. It uses ladder bracket to attach the ladder to the scaffold frame leg.
View More
Ring Lock Scaffolding Side Bracket
Ring Lock Scaffolding Side Bracket, Board Bracket, Consloe Bracket
Ring Lock Scaffolding Side bracket is used at the edge of a scaffolding to extend the reach or extension off of any side of the scaffolding where sunshade comes.
View More
Hook Lock Steel Plank
Galvanized Hook Lock Steel Plank for Scaffolding
Steel plank is used as walkway plank in scaffolding system for construction safety. It is a fitting part of construction scaffolds. There are stamping holes on the scaffolding plank to resist skidding for workers. The galvanized surface and  rib reinforcement design makes scaffolding plank more stronger in the rainy days and moist environment.
View More
Kwikstage Mesh Panel
Kwikstage System Scaffolding Mesh Panel, Brick Guard
Kwikstage Mesh Panel / Brick Guard is placed between the ledger and the steel plank. Designed to be suspended from a guard rail ledger enclosing the space between the ledger and the working platform for safety.
View More
D60 Ring Lock Shoring Scaffolding Ledger
D60 Ring Lock Shoring Scaffolding Ledger / Horizontal
D60 Ring Lock High Load Shoring Scaffolding: It is used in Heavy Duty Load Requirement Construction Support, Including Infrastructure Scaffolding Like Bridge, High Speedway Construction, Industrial Scaffolding like Offshore Construction and High Load Concrete Formwork Temporary Scaffolding. The Vertical is made by O.D60x3.5mm high grade steel tube 1
View More

Home

Production

News

contact