Ring Lock Scaffolding System for Residential Construction

Galvanized Snap On Guard Rail Braces for Scaffolding Frames

Guardrail Brace is one important part of frame scaffolding system, it provides fall protection to the people when working on the scaffold platform.


Scaffold guard rail is made by dia.1.25" x 0.0787"t (O.D 32x2.0mm) pre-galvanized tube, or by black tube and then do electric galvanized, which endures hits and all kind of forces, preventing a person from leaving the area bounded by the platform.

Snap On Guard Rail is matched for Snap on Series Frame Scaffolding and Guardrail Post.

  • Item NO.:

    GRSO
  • Lead Time:

    20days
  • Product Origin:

    Guangzhou, China
  • Shipping Port:

    Guangzhou, China
  • Payment:

    T/T, L/C at sight
  • Min order:

    500PCS
  • Color:

    Galvanized Colour
  • Material:

    Steel
  • Product Detail

Snap On Guard Rails

Code Size (Metric) Size  (Imperial) Weight(kg) Weight(lbs)
 GRSO.10 3048mm 10' 4.93  10.87 
 GRSO.8 2438mm 8' 4.03  8.89 
 GRSO.7 2134mm 7' 3.58  7.89 
 GRSO.6 1829mm 6' 3.13  6.90 
 GRSO.5 1524mm 5' 2.67  5.89 
 GRSO.4 1219mm 4' 2.22  4.90 
 GRSO.3 914mm 3' 1.77  3.90 
 GRSO.2 610mm 2' 1.32  2.91 

Leave Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we

how can we help you
You can contact us any way that is convenient for you. We are available 24/7 via email or telephone.
Contact Us
Related products
Puched Hole Cross Braces
Punched Hole Cross Braces for H Frames
Punched Hole Cross braces enable scaffolding frames to maximize their loading capacity by balancing the frames on both ends.
View More
Snap On Cross Braces
Snap On Cross Braces for American Scaffolding Frames
Snap On Cross braces enable scaffolding frames to maximize their loading capacity by balancing the frames on both ends.
View More
Punched Hole Guard Rail Brace
Punched Hole Guard Rail Brace for Frame Scaffolding
Guardrail Brace is one important part of frame scaffolding system, it provides fall protection to the people when working on the scaffold platform. Scaffold guard rail is made by dia.1.25" x 0.0787"t (O.D 32x2.0mm) pre-galvanized tube, or by black tube and then do electric galvanized, which endures hits and all kind of forces, preventing a person f1
View More
South Africa Type Hook on Board
South Africa Type Hook on Board / Steel planks
Steel plank is used as walkway plank in scaffolding system for construction safety. It is a fitting part of construction scaffolds. There are stamping holes on the scaffolding plank to resist skidding for workers. The galvanized surface and  rib reinforcement design makes scaffolding plank more stronger in the rainy days and moist environment.1
View More
D60 Ring Lock Shoring Scaffolding Standard
D60 Ring Lock Shoring Scaffolding Standard / Vertical
D60 Ring Lock High Load Shoring Scaffolding: It is used in Heavy Duty Load Requirement Construction Support, Including Infrastructure Scaffolding Like Bridge, High Speedway Construction, Industrial Scaffolding like Offshore Construction and High Load Concrete Formwork Temporary Scaffolding. The Vertical is made by O.D60x3.5mm high grade steel tube 1
View More
Ring Lock Scaffolding double Ledger
Hot Dip Galvanized Ring Lock Scaffolding double Ledger
Ring Lock Scafolding Double ledgers are horizontal members ing that allow for increased load carrying capacities not possible with single tube or regular duty ledgers. They provide increased horizontal support for loads and planks.
View More
Aluminum Plywood Plank
American Style Aluminum Plywood Plank for Scaffolding
Aluminum Plywood Plank is made by 6061-T6 or 6082-T6 aluminum extrusion and fire-proof plywood panel, plank width 19" (483mm), plank length from 3' to 10'. The plank complies with OHSA & ANSI A10.8 requirements. Safety load is 75lb/ft2.
View More
Sidewalk Bridge Scaffolding
Sidewalk Protection Scaffolding, Sidewalk Bridge Shed Scaffolding
Sidewalk Shed is a structure constructed to protect pedestrians from objects falling from a building or construction site. Sidewalk Bridge is required when construction work is over 40 feet high or 25 feet high for demolition work and whenever there is a dangerous condition irrespective of the height. A sidewalk shed must be erected whenever materi1
View More

Home

Production

News

contact