Ring Lock Scaffolding System for Residential Construction

D60 Ring Lock Shoring Scaffolding Ledger / Horizontal

D60 Ring Lock High Load Shoring Scaffolding: It is used in Heavy Duty Load Requirement Construction Support, Including Infrastructure Scaffolding Like Bridge, High Speedway Construction, Industrial Scaffolding like Offshore Construction and High Load Concrete Formwork Temporary Scaffolding. The Vertical is made by O.D60x3.5mm high grade steel tube for heavy duty shoring purpose.



Scaffolding Components: Standard, Ledger, Diagonal Brace.


  • Item NO.:

    D60RS.L
  • Lead Time:

    30days
  • Product Origin:

    Guangzhou, China
  • Shipping Port:

    Guangzhou, China
  • Payment:

    T/T, L/C at sight
  • Min order:

    500PCS
  • Color:

    Galvainized Colour
  • Product Detail


D60 Ring Lock High Load Shoring Scaffolding Ledger / Horizontal

Product Details:
Code Description Material Size Weight(kg) Weight(lbs)
D60RS.L.240 2.40M Ledger Ø48.3x3.0mm; Q235-Q355 2400mm (7'10") 8.52  18.79 
D60RS.L.180 1.80M Ledger 1800mm (5'11") 6.53  14.40 
D60RS.L.150 1.50M Ledger 1500mm (4'11") 5.53  12.19 
D60RS.L.120 1.20M Ledger 1200mm (3'11") 4.92  10.85 
D60RS.L.090 0.90M Ledger 900mm (2'11") 3.53  7.78 
D60RS.L.060 0.60M Ledger 600mm (1'11") 2.53  5.58 



Features:

Tube Dimension: O.D 48.3x3.0mm. Other tube thickness 3.5mm/3.25mm/2.75mm/2.5mm is available by request.
Steel Tube Grade: Q235-Q355
Ledger Node Connector: Casting Steel
Wedge Pin: 6mm
Surface Finishing: Hot dip Galvanized; Powder Coated, Painted

Quality Standard: EN12810

Welding Process: Automatic welding



Packing and Loading: On Steel Racks



Leave Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we

how can we help you
You can contact us any way that is convenient for you. We are available 24/7 via email or telephone.
Contact Us
Related products
D60 Ring Lock Shoring Scaffolding Standard
D60 Ring Lock Shoring Scaffolding Standard / Vertical
D60 Ring Lock High Load Shoring Scaffolding: It is used in Heavy Duty Load Requirement Construction Support, Including Infrastructure Scaffolding Like Bridge, High Speedway Construction, Industrial Scaffolding like Offshore Construction and High Load Concrete Formwork Temporary Scaffolding. The Vertical is made by O.D60x3.5mm high grade steel tube 1
View More
Ring Lock Shoring Scaffolding Diagonal Braces
D60 Ring Lock Shoring Scaffolding Diagonal Braces
D60 Ring Lock High Load Shoring Scaffolding: It is used in Heavy Duty Load Requirement Construction Support, Including Infrastructure Scaffolding Like Bridge, High Speedway Construction, Industrial Scaffolding like Offshore Construction and High Load Concrete Formwork Temporary Scaffolding. The Vertical is made by O.D60x3.5mm high grade steel tube 1
View More
7' Bay Internal Stair
7' Bay Internal Stair for American Frame Scaffolding
Internal Stair is the stairway solutions for temporary access. 7' Bay Internal Stairs towers are constructed utilizing scaffolding frames,cross braces, guardrail brace, planks, stairs. The stair towers are set for7' scaffolding bay, and for 5', 6'4", 6'6", 6'7", 6'8" heights to meet different frame heights.
View More
Steel and Plywood Formwork
Steel Frame and Filmed Plywood Formwork
Steel Plywood formwork is made by steel frame and filmed plywood form, it is a kind of is a pre-engineered, factory-built, reusable in situ concrete forming system. It saves time because it is easy to set up and strip. No measuring, sawing, drilling, or nailing is required. The only tool required for setup and stripping is a hammer.
View More
Kwikstage Ladder Access Transom
Kwikstage Scaffolding Ladder Access Transom
Kwikstage Ladder Access Transom is used where a ladder access or trapdoor is required inside a bay. The Ladder Access Transom is located between the two ledgers, this is placed approx 64" from the previous transom. To be used with a Safety Trap-Door, a single section verticle ladder is held in place with 4 nos Metal Ladder Clamp. We recommend that 1
View More
Cup Lock Scaffolding Ledger
Hot Dip Galvanized Cup Lock Scaffolding Ledger
Cup Lock Scaffolding is fabricated by ø48.3x3.25mm (1.90" O.D x 10 gauge) high strength steel tubes. It is a fully Hot Dip Galvanized multi-purpose steel scaffold system suitable for providing general access and supporting vertical loads. The key feature is its bowl locking point which allows up to 4 horizontals to be connected to a vertical in a s1
View More
System Scaffolding Screw Jacks
Adjustable Screw Jacks for System Scaffolding
System Scaffolding Screw Jack is the adjustable base for modular system scaffolding. It provides not only heavy duty load bearing support to the scaffolding, but also provide leveling adjustment. Solid screw jack is made by the solid steel rod with dia.37.5mm after rolling the thread. Hollow screw jack is made by O.D 38x5mm or 5.5mm sealess steel t1
View More
Ring Lock Scaffolding Level Brace
Hot Dip Galvanized Ring Lock Scaffolding Level Brace / Plain Brace
Ring Lock Scaffolding Level Brace, also called Plain Brace, is main component of system scaffolding which use as diagonal ledger. It is used in the large bay mobile scaffolding tower and gives additional strength to the tower structure and keep the tower stable.
View More

Home

Production

News

contact