• 020-82860462
  • Our company has been a professional manufacturing scaffolding ,shoring prop, u head jack,plank and ladder ,coupler ,scaffolding pipe ,scaffolding accessories
  • Our company has been a professional manufacturing scaffolding ,shoring prop, u head jack,plank and ladder ,coupler ,scaffolding pipe ,scaffolding accessories
  • Our company has been a professional manufacturing scaffolding ,shoring prop, u head jack,plank and ladder ,coupler ,scaffolding pipe ,scaffolding accessories
  • Our company has been a professional manufacturing scaffolding ,shoring prop, u head jack,plank and ladder ,coupler ,scaffolding pipe ,scaffolding accessories

» Scaffold erection of construction technology

Shot Description:

1, the scaffolding material should comply with the relevant construction specifications. Frame, board, network must be combined with the use of scaffolding Should leave the wall about 400mm. Frame width 1.2m, step distance 1.5m, double row and so on. 2, scaffolding and other facilities before use by the relevant units required acceptance, and make acceptance…

*Enter your inquiry details

    • captcha
  • Description:

    1, the scaffolding material should comply with the relevant construction specifications. Frame, board, network must be combined with the use of scaffolding

    Should leave the wall about 400mm. Frame width 1.2m, step distance 1.5m, double row and so on.

    2, scaffolding and other facilities before use by the relevant units required acceptance, and make acceptance and delivery to make

    With the procedure, the lease of large-scale machinery and equipment on-site assembly, the acceptance, load test and the relevant units awarded

    Quasi-use permit before use, is strictly prohibited in the absence of acceptance or acceptance of non-qualified to put into use.

    3, for the construction site scaffolding and other safety facilities are not allowed to dismantle, change, must be referred to

    The responsible person and the security administrator’s consent, and take the necessary reliable security measures before removal.

    4, in the steel structure installation phase, the use of scaffolding scaffolding as far as possible the use of the original scaffolding, if no ready-made scaffold

    Frame, the installation staff to erect a scaffolding should be the main steel structure to protect the surface of the paint coating, prevent paint

    Coating damage.

    5, fixed scaffolding and the main structure should be used to connect connections, welding shall not be used, shall not be destroyed

    Main body anticorrosive coating.